Several aseptic line expansions within existing production and distribution facilities.
Removal and pour back of vast amounts of concrete inside the operating facility to install a large underground pressure waste system.
Facilities include several process support-related spaces and ISO 8 clean spaces constructed utilizing IMP walls, ceilings, and epoxy resin flooring systems.
Heavy joist reinforcement is required to support the extensive HVAC packages added to the roof structures for these expansions.