Niagara Bottling

  • Several aseptic line expansions within existing production and distribution facilities.
  • Removal and pour back of vast amounts of concrete inside the operating facility to install a large underground pressure waste system.
  • Facilities include several process support-related spaces and ISO 8 clean spaces constructed utilizing IMP walls, ceilings, and epoxy resin flooring systems.
  • Heavy joist reinforcement is required to support the extensive HVAC packages added to the roof structures for these expansions.

Project Specs

Project Type
Expansion & Renovation
Project Size
N/A
Location
Temple, TX