First United Methodist Church Dallas Renovation & Expansion

  • 14,700 sf renovation of existing basement into prefunction and future classroom space
  • 2,600 sf basement area addition
  • 10,200 sf, three-level addition above the basement that included elevator lobby, restrooms, circulation space and reception area
  • 4,000 sf, two-level volume common area intended to serve as multi-functional gathering space which features the existing exterior sanctuary wall as an exposed architectural element
  • All phases of construction were completed while the facility was fully open and occupied

Project Specs

Project Type
Renovation/Expansion
Project Size
31,500 sf
Location
Dallas, Texas