Southwest Airlines Replacement Outbound Baggage System

  • 14,000 sf baggage handling building
  • Structural steel bridge
  • Relocation of AOA perimeter fence
  • Remodeled EDS room with three CTX machines, a CBRA area, an OSR room, and modifications to the existing conveyor system
  • All work coordinated around maintaining active loading dock and flight operations

Project Specs

Project Type
New Construction
Project Size
14,000 sf
Location
Dallas, Texas