



This project is 243,100 sf, four-level, underground parking garage with the fifth level located behind-grade level retail. The project scope required excavation to be between 5-to-15 feet off of property lines on three sides of the project leaving very little space to move around the exterior. The perimeter walls were formed using a ‘blind side’ method to maximize the parking structure and reduce the required excavation on the exterior of the structure.